The City of Iowa City Water Division operates five horizontal alluvial collector wells as raw water sources for the drinking water treatment plant. Collector wells are located on two well fields in close proximity of the water treatment plant. All five wells were bored between 1999 and 2000, and were put into production in 2003. The Water Division is looking for an assessment of collector well physical condition and production, recommended operational parameters, and recommended improvements with emphasis on higher long-term production.

Solicitation type

Request for proposal

Bid Status

Current

Due Date

02/14/2018 - 2:30pm

Contact