This project will involve the following: demolition, repair and replacement of an existing masonry sludge storage tank façade; concrete patching; removal and replacement of ridged insulation; removal and replacement of aluminum dome cover bearing plates; and removal and replacement of peripheral dome flashing.
Substantial Completion Date: June 30, 2021
Liquidated Damages: $240 per day
Rapid Reproductions / Technigraphics
415 Highland Avenue, Suite 100
Iowa City, IA 52240
Phone: (319) 354-5950
Toll-Free: (800) 779-0093
https://rapidsrepro.com/iowa-city/
$10 per plan set. Deposit refundable if plans/specifications are returned in reusable condition within 14 days of award of project.
October 28, 2020 at 10:30 am
City of Iowa City Wastewater Treatment Facility
4366 Napoleon Street SE, Iowa City, IA 52240