980 feet of 8” PVC water main installed by directional drill method on First Avenue; 120 feet of 6” and 12” ductile iron water main installed by open trench and jack and bore method on Court Street; check valve installed in buried valve vault; and associated copper water services, traffic control, pavement removal, and restoration.
Specified Start Date: June 3, 2019
Substantial Completion: August 16, 2019
Final Completion: October 1, 2019
Liquidated Damages: $500 per day
Technigraphics / Rapids Reproductions
415 Highland Avenue, Suite 100
Iowa City, IA 52240
319-354-5950
1-800-779-0093
$20 per plan set. Deposit refundable if plans/specifications are returned in reusable condition within 14 days of reward of project.
Date: March 26, 2019
Time: 10:00 a.m.
Location: Engineering Conference Room, 3rd Floor, City Hall, 410 E Washington Street, Iowa City, Iowa