Description:
The Project includes, but is not limited to the following: Grading, excavation, and removals of existing concrete sidewalk to install (388 SY) Portland Cement Concrete sidewalk pavement and (465 SY) granular subbase and ADA ramps. Installation of (156 LF) of HDPE tile, Clear and grub existing vegetation and furnish and install surface restoration.
DAVIS-BACON WAGE RATES REQUIRED AND INSPECTED WITH PROJECT.
Project Schedule Information:
Working Days: 40
Specified Start Date: September 19, 2018
Liquidated Damages: $500 per day
Date plans available:
Wednesday, September 5, 2018
Obtain from:
Rapids Reproductions / Technigraphics
415 Highland Ave.
Suite 100
Iowa City, IA 52240
319-354-5950
Cost:
None
Pre-bid Conference:
None