This project includes removal of the existing boiler systems, installation of two high efficiency condensing type boilers, replacement and reconfiguration of the pumping/piping systems, and installation of direct digital controls for the new components. Additionally, the project will include temperature controls upgrades to integrate the existing HVAC systems into the City's Niagara based Building Automation System.
Start Date: August 12, 2019
Final Completion Date: February 28, 2019
Technigraphics / Rapids Reproductions
415 Highland Avenue, Suite 100
Iowa City, IA 52240
319-354-5950
$40 per plan set. Deposit refundable if plans/specifications are returned in reusable condition within 14 days of reward of project.
Date: July 16, 2019
Time: 2:30 p.m.
Location: Engineering Conference Room, City Hall, 410 E Washington Street, Iowa City, Iowa